Construction of building on the railroad by concrete filled steel tubular columns with high-sterength concrete (Fc=60N/mm2).

Accession number;99A0616830
Title;Construction of building on the railroad by concrete filled steel tubular columns with high-sterength concrete (Fc=60N/mm2).
Author; WACHI TOSHIOKI (Tekken Constr. Co., Ltd.) KARASAWA TOMOYUKI (TEKKEN Corp., JPN) OKUNO TOORU (Takenaka Corp.)
Journal Title;Cement & Concrete
Journal Code:F0277A
ISSN:0371-0718
VOL.;NO.628;PAGE.8-16(1999)
Figure&Table&Reference;FIG.19, TBL.7, REF.23
Pub. Country;Japan
Language;Japanese
Abstract;Titled structural type is adopted in commercial building covering JR TACHIKAWA station. Recently concrete filled steel pipe pole structure has become widespread to be adopted in constructing tall building. Concerning this construction, tests of filling concrete related to mixing, conveying, pressing in and others are reported. In executive construction, expected outcome are obtained applying these test results.