|
Accession number;99A1045399
|
| Title;A construction and comissioning of synchrotron radiation monitor for KEK B-factory. |
| Author;
MITSUHASHI T
(High Energy Accelerator Res. Organization, Oho, Ibaraki, Jpn)
FLANAGAN J W
(High Energy Accelerator Res. Organization, Oho, Ibaraki, Jpn)
HIRAMATSU S
(High Energy Accelerator Res. Organization, Oho, Ibaraki, Jpn)
|
Journal Title;Proc Symp Accel Sci Technol
|
Journal Code:F0512B
|
ISSN:0914-2789
|
|
VOL.12th;NO.;PAGE.99-101(1999)
|
| Figure&Table&Reference;FIG.9, TBL.1, REF.4 |
| Pub. Country;Japan |
| Language;English |
| Abstract;A synchrotron radiation(SR) monitor for KEK B-factory has been designed and constructed. The monitor consists of following systems; 1) visible SR beam extraction system having a real time surface flatness measurement system; 2) SR beam relay system; 3) focusing system for the observation of the beam profile; 4) SR-interferometer for the measurement of the beam size; 5) extra branch beamline for other measurement such as streak camera. The two sets of SR monitor systems are constructed for the HER and the LER. The results on commissioning of SR monitor are also reported. (author abst.) |
|
|
|
Related Articles;
|