Investigation on efficiency upgrading of uninterruptible engineering method. (Development on an engineering method of integrating three cables to a bundle of high voltage bypass cable.
|
Accession number;05A0132569
|
| Title;Investigation on efficiency upgrading of uninterruptible engineering method. (Development on an engineering method of integrating three cables to a bundle of high voltage bypass cable. |
| Author;
MAEDA NORIHIRO
(Kansai Electric Power Co., Inc., JPN)
MORIMOTO HIDEYUKI
(Kansai Electric Power Co., Inc., JPN)
MORIMOTO TSUTOMU
(Kansai Electric Power Co., Inc., JPN)
SEKI SHIN'ICHI
(Kansai Electric Power Co., Inc., JPN)
YUDA HIROKI
(Kansai Electric Power Co., Inc., JPN)
OTSUKI TOMOO
(Kansai Electric Power Co., Inc., JPN)
KAMINISHI TOSHIKAZU
(Kansai Electric Power Co., Inc., JPN)
OTA HIROAKI
(Kansai Electric Power Co., Inc., JPN)
|
Journal Title;R&D News Kansai
|
Journal Code:L0171A
|
ISSN:0913-4352
|
|
VOL.;NO.418;PAGE.6-7(2004)
|
| Figure&Table&Reference;FIG.4 |
| Pub. Country;Japan |
| Language;Japanese |
| Abstract;The titled engineering method is composed of 1) a simple suspension-wire support engineering method and 2) an engineering method integrating three cables of high-voltage bypass cable to a bundle to elongate their length. By using this method, a work preparing elongation of cables on a pole can be done without, and by reducing numbers required for fixation of the cables reduction of working times could be enabled. And, by enabling the cables to wind to a drum it was possible to reduce numbers of workers required for a worker at every three drums in the conventional method to enable to establish minimum numbers of workers. |
|
|
|