Sitemap
Home
Opinions
Press Releases
Link Categories
J-EAST
TOP
>
J-EAST
>
List of Journal Titles (D)
> Dai-dan Technical Current News
List of Jounal Titles
A to Z index of Journal Title. Choose a letter.
A
/
B
/
C
/
D
/
E
/
F
/
G
/
H
/
I
/
J
/
K
/
L
/
M
/
N
/
O
/
P
/
Q
/
R
/
S
/
T
/
U
/
V
/
W
/
X
/
Y
/
Z
/
0
/
1
/
2
/
3
/
4
/
5
/
6
/
7
/
8
/
9
Dai-dan Technical Current News
85
The adoption case of DAIDAN Active Noise Controller(DANC).
The facility of the aerosol factory.
The installation Work of the Crystal Liquid Ice Storage Air Conditioning System.
The construction of the clean room of the HDD factory. No.2
Construction report of the cogeneration facility in the pharmaceutical factory.
The construction report of the Higashinada sewage-treatment plant.
The labor saving improvement construction report in the existing building.
The air conditioning equipment of the Oga municipal hospital.
The safety control system of the Nara Civic Hall.
The water pump unit spouted the fire.
86
Experience in construction of nursing facility for old people.
Air conditioning system in NTT Keihanna Building.
Ventilating system in large dish washing machine room of catering plant for air passengers.
Construction of refrigerating system for a constant temperature warehouse for cereal.
Installation of exhaust ducts for noodle processing plant.
Effect of introducing intranet on business in office of Nagoya Branch.
Preparation for ISO 9000 field follow-up inspection.
Installation of electrical systems for processing plant of rubber base waste materials.
Identification of routes of electrical trunk cables in existing building.
Setting of anchor bolts for self-standing electrical distribution panels.
Case of hot water supply system using "water heater with heat-storage type storage tank".
Water circulation, filtration and air conditioning system for hot water swimming pool.
Sound insulation measures for water supply and drainage piping in multipurpose hall.
Renewal of station building in very short construction period.
Design-build of large shopping center with very low price.
87
Delivery of a vertical flow type bioclean room unit.
Case on manufacturing room pressure control in pharmaceutical factory improvement.
Completion of a pharmaceutical factory.
Duct airtight test in air conditioning validation.
Construction of a certain automobile component factory with the aim of a factory in the twenty-first century.
Proposal of a piping header method using a sheath tube system.
Ice storage system of Chugoku Electric Power Co. Inc., Tsuyama service office.
Construction of lighting facilities in hydroponic culture.
LonWorks.
New estimation system.
Certification acquisition of ISO9001 and 9002. Osaka headquarters, technical centre, Hokkaido branch, Tohoku branch, Niigata branch, and Shikoku branch.
Home
Opinions
Press Releases
Link Categories
J-EAST
Cafe Terrace
Topics
Hot Articles
Link to Us
Questionnaire
Contact Us
FAQ
Privacy Policy
Copyright Policy
Copyright (c) 2006-2007 Japan Science and Technology Agency. All Rights Reserved.