Sitemap
Home
Opinions
Press Releases
Link Categories
J-EAST
TOP
>
J-EAST
>
List of Journal Titles (Z)
> Zenitaka Technical Research Report
List of Jounal Titles
A to Z index of Journal Title. Choose a letter.
A
/
B
/
C
/
D
/
E
/
F
/
G
/
H
/
I
/
J
/
K
/
L
/
M
/
N
/
O
/
P
/
Q
/
R
/
S
/
T
/
U
/
V
/
W
/
X
/
Y
/
Z
/
0
/
1
/
2
/
3
/
4
/
5
/
6
/
7
/
8
/
9
Zenitaka Technical Research Report
23
Construction Development of Reinforced Concrete Beams with Truss-Shaped Reinforcing Bars. (Part 1). Outline of Construction system and Loading Test for Truss-shaped Bar Unit.
Construction Development of Reinforced Concrete Beams with Truss-Shaped Reinforcing Bars. (Part 2). Reversed Cyclic Loading Test for RC Beams.
Construction Development of Reinforced Concrete Beams with Truss-Shaped Reinforcing Bars. (Part 3). Construction Test of Full-sized Beams.
Study on the Retrofitting of Existing Reinforced Concrete Columns. Uni-axial Compression Test.
Development of Estimating Method for Strength of Concrete in Structures with Small Size Cores.
Experimental Study on Design Method for Hybrid Basement Wall.
Ecological Diaphragm Wall.
Development of FFC Lining Method. Report of Verification Test at Akamatsu Tunnel.
Comparison of 3 dimension Models for Dynamic Response Analysis for the Cable-Stayed PC Bridge.
The Distribution of Compacted Concrete Waste Porosity.
Development of High-Fluidity Concrete for Dams.
Development of FFU Lightweight Passive Pressure Plates Research on the Flexural Behavior of Layered FFU Beams.
A Report on Use of RTK-GPS in Dredging Project of Suga Area of Kamaishi Port.
The Design of Natsumaya Viaduct.
Design of P1-pire at Yokohama Kanjou 2 gousen for Earthquake.
Land Slide Preventive Works for Kobe Layers Cutting.
The Dual Structure of PC Tank.
A development of shield Earth Retaining Wall System. Set up SEW wall and Test of joint H-section steel pile.
The Construction of the Open-Type Horseshoe-Shield Tunnel.
Advanced Construction of Ino Dam. Construction of Concrete Dam by Expended Rayer Method.
Construction of Terabutchi Bridge (Half-ThroughType R.C Arch Bridge).
The Construction Jacking Up The Lateral Sewer from the Shield Tunnel. The Construction of the Trunk Sewer between Senda and Kannabe.
The Construction of Combination Multi Construction of Section Synchronization Method in the Multiple Dwelling House.
The Planning of Erecting The Structural Steel Work & Execution for Super Truss with Cantilever Frame.
All Weather Temporary Roof "APPARE".
Construction of 3 meter-Test-Range Radio Wave Anechoic Cambers.
Construction Report on the Flat Slabs with Unbonded Prestressing Steel Applied to Large Scale R/C Warehouse.
Repair Method for Damaged Reinforced Concrete Structures. Report of Repair Process.
Home
Opinions
Press Releases
Link Categories
J-EAST
Cafe Terrace
Topics
Hot Articles
Link to Us
Questionnaire
Contact Us
FAQ
Privacy Policy
Copyright Policy
Copyright (c) 2006-2007 Japan Science and Technology Agency. All Rights Reserved.